PROJECT SUMMARY

HAMILTON ISLAND ENTERPRISES

Project Value - $2,000,000

Hamilton Island Enterprises

1997 - Current

Major Civil works including: 3 Subdivisions; 9 Major Pump Stations; 40 Pump Packages; Installation and connection of main services between Hamilton Island and Dent Island; Hamilton Island Marina – Installation of Shire Based Civil Services and pontoon water Services on 2 arms.

PRE 2010

Project Value - $3,000,000

Golding Contractors

2008 - 2009

Installation of Shore Based Civil Services, Sewerage and Water Reticulation; Stormwater Drainage; Installation and connection of two major and two internal Pump Stations; Decommissioning and relocation of existing Pump Stations; Installation of welded Syntakote 375mm sewer and 600mm water mains.

PORT OF AIRLIE

Project's Value - $2,300,000

Marian Water Main and Booster / Shakespeare Street Water Main

June 2011 - Sept 2012

Installation of Pump Station Building, multistage pumping system and associated electrical and mechanical works. 1.2 Km of water main including 2 x under bores and Installation 950 M of 300 mm DICL  water main, road crossings and connections including pavement repairs respectively.

MACKAY REGIONAL COUNCIL

2011

Project Value - $1,400,000

Proserpine Water Mains

Sept 2011 - Mar 2012

Installation of water main and road crossings associated with Road works upgrades

WHITSUNDAY REGIONAL COUNCIL

Project Value - $1,200,000

Malcomson Street Water Main Upgrade

Aug 2012 - Mar 2013

Installation of 1km of 450mm DICL and 900m of 150mm DICL Water Main.

Removal of existing 150 C.I. Water Main

ROADTEC

Project Value - $3,380,000

Mirani Water Main and Booster

Jan 2012 - Feb 2013

Installation of Pump Station Building, multistage pumping system and associated electrical and mechanical works. 4.5 KM of water main including 4 x under bores

MACKAY REGIONAL COUNCIL

2012

Project Value - $4,200,000

Prawn Farm SPS

Mar 2013 - Mar 2014

Upgrade of Major Sewage Pump stations including by passing, replacing surface coatings, New pipework, pumps and lids, replacement switchboards and commissioning, Installation of 3.0 Km of rising main including 3 x Under bores

MACKAY REGIONAL COUNCIL

2012

2013

Project Value - $1,800,000

SPS Pump Station Upgrade

Mar 2013 - Dec 2013

Upgrade of 3 x Major Sewage Pump stations including by passing, replacing surface coatings, New pipework, pumps and lids, replacement switchboards and commissioning

MACKAY REGIONAL COUNCIL

Project Value - $1,480,000

Eton WTP

Sept 2013 - Feb 2014

Installation of small water treatment plant, building, bore pumps and associated mechanical and electrical works

 

MACKAY REGIONAL COUNCIL

Project's Value - $1,766,000

Cemetery Road / Flow Metres

Jul 2014 - May 2015

Installation of 1.3 KM of 450 DICL Pipe for a replacement water main in a road, the project included Traffic control, asphalt repairs, concrete pits and a flow meter and Installation of 6 Area Flow meters into trunk Water Mains respectively.

MACKAY REGIONAL COUNCIL

2014

2015/2016 and Current Projects

Project's Value - $3,080,000

Water Mains Projects / 42 Sewerage Pump Resiliance Upgrades

Aug 2015 - Current

Various Water Main and Sewerage Pump Replacement Projects across Whitsunday Regional Council ranging in sizes from 100mm – 150mm. Included reinstatement of asphalt road surfaces.

WHITSUNDAYS REGIONAL COUNCIL

Project's Value - $2,155,000

SPS Pump Station Upgrade / Midge Point and Seaforth Re-Chlorination Facilities

Barnes Creek Temporary Sewer Bypass

Jan 2015 - Oct 2016

Upgrade of 4 x Sewerage Pump Stations including by-passing works, new pipework, pumps and lids, new switchboards and commissioning of refurbished pump station. Site civil works including new concrete pits, gravel hardstand areas and site fencing.

Installation of new CL2 Gas re-chlorination equipment and facilities at Seaforth and Midge Point.

Temporary installation of 570 meters of 450mm poly pipe across Barnes Creek Bridge to allow Mackay Regional Council to perform emergency repair works to their system.

MACKAY REGIONAL COUNCIL

Project Value - $1,375,000

D&C Fire Booster Pump Station - Mackay Port

Jun 2015 - Nov 2015

Design & Construct Fire Booster Pump Station including installation of 2 x ½ meg stainless steel tanks. Included supply and installation of electrical and diesel fire pumps with control switchboards

NORTH QUEENSLAND BULK PORTS

Project's Value - $550,000

Sewer Rising Main / Sewer Pump Station Upgrade

Nov 2015 - Aug 2016

Installation of 1.4km of 110mm Poly Sewer Rising Main including installation of air valve and scour valve arrangement. Upgrade of Mackay Airport main sewerage pump station including new epoxy coating to wet & dry wells, installation of new pipework and pumps, new concrete hardstand and site fencing. Maintain bypassing of pump station whilst works were completed.

NORTH QUEENSLAND AIRPORT TRUST - MACKAY AIRPORT